Data Centre (Confidential)

Confidential

Another well delivered project from start to finish from Temperature Controls Key Account Manager who designed, programed and delivered the installation without any disruption. The installation teams and supervisor were a pleasure to work with and went over and above to get this job completed to such a high standard.

Project Overview

Having previously installed energy saving solutions to the office accommodation, replacing inefficient electric water heaters and panel heaters for air to water air source heat pumps and electric door curtains for DX models. This Blue Chip have engaged with us again to replace their old energy hungry and failing Data Centre cooling and humidity controlled systems.

The consultation time from initial enquiry to delivery was over 7 years.

 

Project Details

Temperature Control designed, installed and commissioned Phase 1. Works were carried out successfully, on time, within budget and without disruption to the Data Centre.

The Data Centre was live with thousands of sites and operations depending on it staying live, we worked closely to ensure there was no downtime or disruption to the business.

Phase 2 is already in discussion.

Project Budget

£withheld

 

 

Project Description

The client is currently seeing the benefits of the work completed in Phase 1 as they closely monitor on and off site the conditions of the rooms which are now providing stable cooling and humidity controlled conditions.

Mitsubishi PFD Down flow units, humidifiers and specialist control monitoring package were installed in this application

Temperature Control have also tailor made a bespoke all-inclusive 7 year full maintenance package coving all callouts, parts and labour throughout the term and managed by our Service and Maintenance Department 365 days 24hr helpdesk with an agreed 4 hour response.