Islington Waste Recycling Centre

Temperature Control were a pleasure to work with and provided a finished installation on time, and to the very highest quality. Their management team always went above and beyond to ensure the highest standards and to make the process smooth, including working some very unsociable hours. A very special project that wouldn’t have happened with out everyone involved from TCL. They will always have my thanks.

Vital Energi

Project Overview

The Waste Recycling Centre at Islington is the processing centre for the local council’s recycling operations. It consists of the main processing halls, car parks and administration offices. work forms part of the council’s decarbonisation scheme to reduce energy usage and carbon emissions across the site. Temperature Control undertook all mechanical works at Islington Waste Recycling Centre including the AC, Mechanical pipework, insulation, drainage and water treatment.

 

Project Details

Mechanical works including the upgrading of existing AHUs and upgrading the site wide domestic hot water away from gas to electric air and water source heat pumps.

Project Description

Refurbishment of the existing Air Handling Units to provide long term operation and assist with the reduction of energy use on site by replacing the existing gas fired heating coils with electric pre heat and refrigerant coils including associated condensers and ancillary equipment. Works included the full design of fan upgrade to AHUs and associated DX heating system along with electric pre heaters. A combined Daikin and BMS controls package was installed to optimise the system’s efficiencies.

The existing Direct Gas Fired Domestic Hot Water (DHW) generation system was replaced with an air-to-water source heat pump and new LTHW services and associated equipment combined with air and water source heat pumps. Temperature Control completed all associated plant movement and mechanical pipe work installations along with system flushing, balancing and commissioning.

 

 

Project Outcome

The works were carried out in a phased approach to ensure the building remained operational throughout the upgrade process over 6 months, which was critical for recycling centres business activities. All works completed on schedule and within budget.

These works meant the full decarbonization of the centre which contributed to significant reductions in gas usage.

 

Project Budget

£380,000.00